Major repair project of the section of the state highway No. A1 Vilnius – Kaunas – Klaipėda from 100.47 to 101.79 km
Product of the Year 2020 in Lithuania
Pedestrian and Cyclist Viaduct Project through Narbuto str. in Vilnius
Product of the Year 2019 in Lithuania
Grigiškės Transport Node Reconstruction Project Stage III
Product of the Year 2018 in Lithuania
Reconstruction project of the highway A5 Kaunas-Marijampolė-Suvalkai section from 35.40 to 45.15 km
Product of the Year 2018 in Lithuania

Metro line project in Sweden

The TUB A project is a yellow line in the public transport system in Stockholm, which includes three new metro stations Hagastaden - Södra Hagalund - Arenastaden and new metro tunnels between them. Two underground metro lines of about 4.0 km in length are being designed, which are about 30 m deep underground. A parallel service tunnel and three working tunnels (HGSw.t. HGL w.t. and ARS w.t) have been designed to serve this metro line, which will assist in the construction and execution of works in both the service tunnel and the metro. During the installation of this project, about 670,000 cubic meters of rock will be blasted and about 37,000 cubic meters of concrete will be used. The project is planned to be implemented in 8 years.

Design work is performed by engineers of the Road Department of Kelprojektas.

Main works: design solutions of horizontal and vertical curves, design of traffic organization and horizontal and vertical marking, preparation of 3D models, calculation of work quantities, preparation of drawings.